References and case studies
A closer look at our projects: where we started, what we delivered and what worked for us. We publish case studies with our customers' consent.
- completed projects
- 200+
- years of experience
- 14+
- countries with installations
- 4
Case studies
Data acquisition and BMS for Hyundai Steel
Cooling water control system, data acquisition from process units and a BMS for the entire plant in Ostrava with more than 10,000 data points.
Circular assembly line with robots and cameras
Control of a 10-module line for Gebauer & Griller Kabeltechnik in Mikulov: stations, transfer units, robots, cameras, safety program and production data.
Ice rink refrigeration at three ice stadiums
Ammonia refrigeration in Dobříš, Český Těšín and Litvínov: compressor and plant control, communication with the original controls and Promotic SCADA.
Data collection and OEE visualisation in production
Machine data instead of manual records, OEE per shift, downtime reasons from operators and an overview right at the line.
A test chamber for air pressure gust tests running on BAVIS
The development test lab of a building materials manufacturer: 10 ms data without losses, gust evaluation, test reports and operation from the browser.
Technical articles
Practical procedures and experience: migration to WinCC Unified, data acquisition, PLC and visualization.
The full list of customers and industries is on the home page under References. We are happy to provide customer contacts on request.