Request a quote
Technical articles

Articles from industrial automation practice

Procedures we use on our own projects: AI in TIA Portal, PLCs, migration and visualisation. No marketing, with concrete steps.

Latest articles

A smart switch without the cloud: what to ask before it goes into the wall

Seven questions before choosing a smart switch: internet outage, account and app, neutral wire, integrations, updates and security.

Read the article →

Remote PLC access: how to connect to a machine securely

A VPN gateway, remote desktop or read-only data. What never to do, the security minimum for every machine and what NIS2 says.

Read the article →

AI and WinCC Unified: what can and cannot be automated on screens

Bulk screen edits, tags, faceplates, alarms and checks after migration. And what Openness cannot do: the faceplate type, the real appearance and Undo.

Read the article →

Testing PLC programs with AI: unit tests and simulation in PLCSIM

Block unit tests, scenarios and a virtual FAT in PLCSIM Advanced: what the AI prepares, what the programmer supplies and what simulation will not reveal.

Read the article →

TIA Portal project documentation in minutes: what AI can do and what a human must check

Comments and titles in blocks, handover documentation and an operating manual in PDF, an I/O checklist and fault table. And what a human must check before handover.

Read the article →

ChatGPT and Siemens PLCs: what AI can and cannot do in TIA Portal

What a chat on its own handles (explaining code, drafting SCL), where it fails and how to connect AI directly to your TIA Portal project.

Read the article →

Converting STL (AWL) to SCL with AI: procedure and pitfalls

Block inventory, automatic conversion, behaviour comparison in PLCSIM and pitfalls: indirect addressing, AR registers, the status word and S5 timers.

Read the article →

AI review of a PLC program before FAT: code review in TIA Portal

What the automated review of blocks and the whole PLC checks, the safety program, unused objects, Excel output and a checklist before FAT.

Read the article →

Migrating HMI to WinCC Unified: procedure, pitfalls and how to save time

What TIA Portal converts on its own, what has to be done by hand, and a recommended step-by-step procedure including a checklist.

Read the article →

Case study: data acquisition and BMS for an entire plant

Why access to machines with a closed control system is the most expensive part of data acquisition, and how to avoid it.

Read the case study →

Case study: circular assembly line

Module time measurement, step monitoring and a safety program on a line with robots and cameras.

Read the case study →