Articles from industrial automation practice
Procedures we use on our own projects: AI in TIA Portal, PLCs, migration and visualisation. No marketing, with concrete steps.
Latest articles
A smart switch without the cloud: what to ask before it goes into the wall
Seven questions before choosing a smart switch: internet outage, account and app, neutral wire, integrations, updates and security.
Remote PLC access: how to connect to a machine securely
A VPN gateway, remote desktop or read-only data. What never to do, the security minimum for every machine and what NIS2 says.
AI and WinCC Unified: what can and cannot be automated on screens
Bulk screen edits, tags, faceplates, alarms and checks after migration. And what Openness cannot do: the faceplate type, the real appearance and Undo.
Testing PLC programs with AI: unit tests and simulation in PLCSIM
Block unit tests, scenarios and a virtual FAT in PLCSIM Advanced: what the AI prepares, what the programmer supplies and what simulation will not reveal.
TIA Portal project documentation in minutes: what AI can do and what a human must check
Comments and titles in blocks, handover documentation and an operating manual in PDF, an I/O checklist and fault table. And what a human must check before handover.
ChatGPT and Siemens PLCs: what AI can and cannot do in TIA Portal
What a chat on its own handles (explaining code, drafting SCL), where it fails and how to connect AI directly to your TIA Portal project.
Converting STL (AWL) to SCL with AI: procedure and pitfalls
Block inventory, automatic conversion, behaviour comparison in PLCSIM and pitfalls: indirect addressing, AR registers, the status word and S5 timers.
AI review of a PLC program before FAT: code review in TIA Portal
What the automated review of blocks and the whole PLC checks, the safety program, unused objects, Excel output and a checklist before FAT.
Migrating HMI to WinCC Unified: procedure, pitfalls and how to save time
What TIA Portal converts on its own, what has to be done by hand, and a recommended step-by-step procedure including a checklist.
Case study: data acquisition and BMS for an entire plant
Why access to machines with a closed control system is the most expensive part of data acquisition, and how to avoid it.
Case study: circular assembly line
Module time measurement, step monitoring and a safety program on a line with robots and cameras.