Data acquisition and BMS for the entire Hyundai Steel plant in Ostrava
Cooling water control system, data acquisition from process units and a building management system with more than 10,000 data points, plus long-term support of the control systems in operation.
- data points in the BMS
- 10 000+
- scope
- entire plant
- support in operation
- long-term
Customer and assignment
Hyundai Steel Czech s.r.o. operates a production plant in Ostrava with many process units from different suppliers. The assignment covered cooling water control for the process, data acquisition from the process units and a building management system for the entire plant.
What we delivered
- Cooling water control system for the plant's process.
- Data acquisition from the process units into one system.
- A BMS for the entire plant with more than 10,000 data points.
- Connecting further machines and units, including machines with a supplier's closed control system.
- Comprehensive support of the control systems in operation.
What we ran into
The hardest part of integration is usually not the software itself but access to data from machines whose control system the supplier has locked. Each such machine needs its own solution and often a paid package from the manufacturer just to make the data readable at all.
That is why we recommend addressing data availability when buying new equipment. The specification should include a standard interface such as OPC UA, a list of available signals and energy metering. Retrofitting integration into a finished machine is usually much more expensive.
Result
Data from the process and buildings is in one place, and further plant units are being connected to the same foundation step by step. We support the control systems in operation long term, so changes and extensions are handled by someone who knows the plant.
What this means for you
- Start data acquisition with an inventory: which machines you have, which interfaces they offer and who owns their control system.
- Consistent naming of signals and alarms from the start saves work with every future extension.
- For new machines, require an open interface and energy metering already in the tender documents.
Working on data acquisition or a BMS?
Send us a short description of your plant. We will propose an approach and estimate the effort.